VELEN Biomethan Plant

Location Germany
Construction Period 2023/24
Input Pig and cattle slurry, pig ,cattle, horse, chicken and turkey manure and dry chicken droppings
Fermenter 2 x 9,500 m³ steel tanks, new construction of two fermenters
Gas utilization Gas treatment with pressure swing adsorber (DWA) for an extended biogas plant, 1,860 Nm³/h biogas, 945 Nm³/h biomethane, biomethane up to 2,000 Nm³/h is planned
   
Specials 2 secondary digesters, 1 external gas storage tanks, separation of digestate
Responsibility Implementation planning, preparation and participation in the award of contracts, construction supervision (site management), commissioning, as well as: Hazard assessment, explosion protection document, operator training
News

News 16.10.2023  Insights into the conversion of two RNG plants projects

News 19.06.2024 Focus on CO2 liquefaction and biomethane production

News 02.06.2025 Bioenergie Velen GmbH's biomethane plant successfully commissioned - a strong signal for the energy transition