VELEN Biomethan Plant
| Location | Germany |
| Construction Period | 2023/24 |
| Input | Pig and cattle slurry, pig ,cattle, horse, chicken and turkey manure and dry chicken droppings |
| Fermenter | 2 x 9,500 m³ steel tanks, new construction of two fermenters |
| Gas utilization | Gas treatment with pressure swing adsorber (DWA) for an extended biogas plant, 1,860 Nm³/h biogas, 945 Nm³/h biomethane, biomethane up to 2,000 Nm³/h is planned |
| Specials | 2 secondary digesters, 1 external gas storage tanks, separation of digestate |
| Responsibility | Implementation planning, preparation and participation in the award of contracts, construction supervision (site management), commissioning, as well as: Hazard assessment, explosion protection document, operator training |
| News | News 16.10.2023 Insights into the conversion of two RNG plants projects News 19.06.2024 Focus on CO2 liquefaction and biomethane production News 02.06.2025 Bioenergie Velen GmbH's biomethane plant successfully commissioned - a strong signal for the energy transition |