DAISEN Biogas Plant
| Location | Daisen, Japan |
| Construction Period | 2013/14 |
| Input | Pig manure, fats, sewage sludge, industrial kitchen waste |
| Fermenter | Enameled steel tank, 5,000 m³ |
| Gas utilization | Gas engine, 3 x 370 kWel |
| Extension | Integration of an existing biogas plant |
| Specials | One digester, one secondary digester with gas holder roof, integration of tanks from an existing biogas plant, mesophilic operation |
| Responsibility | Basic evaluation, pre-, draft- and execution planning, tendering, participating in contract awarding process, site management/project controlling, start-up, training for operators |
| Download Datasheet | datasheet Daisen 2014 |