BOECKERMANN Biogas Plant
| Location | Germany |
| Construction Period | 2001/ 2002 |
| Input | Manure, corn silage, grass silage, dung |
| Fermenter | Glass coated steel tank, 2,500 m3 |
| Gas utilization | Dual fuel co-generator 2 x 160 kWel |
| Extension | 2013: Residue storage tank (5,000 m3) |
| Specials | Digester, secondary digester with gas holder roof, heat utilisation in the pig stables |
| Responsibility | Basic evaluation, pre-, draft-, approval and execution planning, tendering, participating in contract awarding process, site management/project controlling, start-up, operation |
| Download Datasheet | 101Boeckermanenglisch040222.pdf |