VELEN Biomethan Plant

LocationGermany
Construction Period2023/24
InputPig and cattle slurry, pig, cattle, horse, chicken and turkey manure and dry chicken droppings
Fermenter2 x 9,500 m³ steel tanks, new construction of two fermenters
Gas utilizationGas treatment with pressure swing adsorber (DWA) for an extended biogas plant, 1,860 Nm³/h biogas, 945 Nm³/h biomethane, biomethane up to 2,000 Nm³/h is planned
  
Specials2 secondary digesters, 1 external gas storage tanks, separation of digestate
ResponsibilityImplementation planning, preparation and participation in the award of contracts, construction supervision (site management), commissioning, as well as: Hazard assessment, explosion protection document, operator training
News

News 16.10.2023 Insights into the conversion of two RNG plants projects

News 19.06.2024 Focus on CO2 liquefaction and biomethane production

News 02.06.2025 Bioenergie Velen GmbH's biomethane plant successfully commissioned - a strong signal for the energy transition