DIPPEL Biogas Plant
| Location | Germany |
| Construction Period | 1996 |
| Input | Manure, dung with straw, other organic waste |
| Fermenter | Two steel tanks, 100 m3 each |
| Gas utilization | Dual fuel co-generator , 45 kWel, container |
| Specials | Two digester, gas bag, solid/liquid separation |
| Responsibility | Basic evaluation, pre-, draft-, approval and execution planning, site management/project controlling, start-up (for TBW GmbH) |