HEILIGENKREUZ Biogas Plant

LocationHeiligenkreuz am Waasen, Austria
Construction Period2002
InputManure, fats, corn, glycerine, kitchen waste, grass, concentrate of fruits, waste of bakeries
FermenterConcrete tank, 1.100 m3
Gas utilizationGas engines, 511 kWel
SpecialsTwo-stage system with hydrolysis tank, one digester, one secondary digester, heat utilisation in the village
ResponsibilityBasic evaluation, pre-, draft-, approval and execution planning of main components, measurement and process technology, start-up, optimisation