W&A Small digestion Plant

LocationGermany
Construction Period1997 -1999
InputBlack water, kitchen waste
Fermenter6 m³
Gas Gas stove
Specials6 m3-digester for the digestion of blackwater of several houses equipped with vacuum toilets, modular system
ResponsibilityBasic evaluation, pre-, draft- and execution planning incl. pre-fabrication and final assembly, site management/project controlling, start-up (for TBW GmbH)