TORRES DE SEGRE Biogas Plant
| Location | Spain |
| Construction Period | 2011/2012 |
| Input | Sludge from slaughterhouse, water treatment muds, glycerin or vegetable oil, corn silage |
| Fermenter | 2 x 4,400 m³ epoxy coated steel |
| Gas utilization | 2 x 1,2 MWel gas engine |
| Specials | Biogas plant digesting organic waste: Reception hall for waste, two digester, one secondary digester, separator, mesophilic operation, heat utilisation |
| Responsibility | Basic evaluation, pre-, draft-, approval and execution planning, tendering, participating in contract awarding process, site management/project controlling, start-up |
| Web | http://www.ecobiogas.es |