GAERTEC Biogas Plant
Location | Germany |
Construction Period | 1997 |
Input | Kitchen waste, organic industrial waste (2,000 Mg/a) |
Fermenter | Steel tank, 150 m3 |
Gas utilization | Dual fuel co-generator, 27 kWel |
Specials | Pilot plant, Freese system |
Responsibility | Basic evaluation, pre-, draft- and execution planning, tendering and construction of digester |