| Biogas UELZEN GmbH WINTER/RIGGERT/TIMM/KLIPP Biogas Plant |
||||
![]() |
||||
| Location: | Germany | |||
| Time of erection: | 2001/2002 | |||
| Input: | Manure, corn, onions, potatos, agricultural residues | |||
| Fermenter: | concrete tank, 1.250m³ | |||
| Co-generator: | Gas engine: 311 kW | |||
| Specials: | Biogas Plant of 4 farmers, Post digestion tank: 1.250 m³ concrete steel, gas holder above fermenter and post digestion tank, 1.200m³-manure storage tank | |||
| Responsibility: Conception, Preplanning, Permission, detailed and final plannings, supervision of erection, start-up. Download data-sheet (pdf) |
||||
![]() |
||||