- Issue of a hazard analysis, based of the operation safety order for biogas plant in Germany
- Issue of a hazard analysis, based of the operation safety order for biogas plant in Germany
- Extention of a biogas plant in Germany (Co-Generator with 800 kW)
- Complete engineering of a waste digestion biogas plant in the Netherlands, conception, detail and final design, cost assessment, call for tender, supervision and start up
- Modification of an existing biogas plant, monitoring of the permission (additional digester)
- Object planning of parts of an energy raw material biogas plant in Italy
- Issue a study about biowaste fermentation placed by a waste-water-teatment-plant in Germany
- Complete engineering of a waste digestion biogas plant in Finland, conception, detail and final design, cost assessment, call for tender, supervision and start up
- Issue of a hazard analysis, based of the operation safety order for a biogas plant in Germany
- Preliminary design of an energy raw material biogas plant in Turkey
- Consultancy for engineering a biogas plant in Germany
- Issue of a due-diligence examination for a biogas plant in Germany
- Issue of the documents for the modification of the permission (immission control law) based of the extention of a biogas plant in Germany
- Extension of an existing biogas plant with renewable raw materials input in Germany. (a further co-generator, using the heating, reconstruction the feeding and the pipeline engineering)
- Issue of a due-diligence examination for a biogas plant in Germany
- One-site building inspection for construction a biogas plant in the Netherlands
- Establishing the basis, Preliminary, Final design and Permission of a biogas plant in Germany
- Consulting service for aspects of the industrial safety of a biogas plant and assistance by call for tenders in China
- Complete engineering of a waste digestion biogas plant in the Netherlands, conception, detail and final design, cost assessment, call for tender, supervision and start up
- Extension of a biogas plant , basing of a valuation report in Germany
- Issue an insurence survey for an biogas plant in Germany
- Technical advice and evaluation of a biogas plant conception, redarding of the compensation based on the Renewable Energies Act (EEG)
- Drafting of an expert's expertise for optimization the input device of a biogas plant
- Preliminary stage leading to preparation a hazard analysis based of the operation safety order for biogas plant in Germany
- Preliminary design of renewable raw material biogas plant in Germany
- Issue an expertise for evaluation the costs for sulfur removal of a biogas plant in Germany
- In preparation for a due-diligence examination for a biogas plant with gas conditioning in Germany
- Engineering of a waste digestion biogas plant in Spain. Conception, Final design and Start-up
- Technical expertise of a biogas plant in Germany (investigation of damage)
- Technical expertise of a biogas plant in Germany (investigation of damage)
- Preparation of site-inspection for some biogas plants in Canada
- Technical expertise of tender, including recommendations the placing for steel tanks and agitators for Biogas plants in Germany
- Preplanning of a waste digestion biogas plant in Ireland
- Consulting service for the documentation of storage cover for biogas plant in Germany
- Survey of the construction level of a biogas plant in Germany
- Consultancy for engineering a digestate preparation plant for algae in Germany
- Issue of a technical Due Diligence for a biogas plant in the Netherlands
- Inspection of a biogas plant in Germany
- Technical evaluation of an excisting biogas plant inluding gas injection and evaluation of the potential of optimizing the technology (Germany)
- Issue an expertise for evaluation the costs of a biogas plant in USA to find potential investors
- Issue an expertise for evaluation for optimization a biogas plant in Germany
- In preparation for a due-diligence examination for a biogas plant with gas conditioning and evaluation of the optimization potenzial in Germany
|
 |