[plant types] [project overview (1999) (2000) (2001) (2002) (2003) (2004) (2005) (2006) (2007) (2008) (2009) (2010) (2011)] [worldwide]  
     
  Project Overview 2008    
 
  1. Operator service (kf-operator) for an anaerob digestion plant in France

  2. Extension about one silo in a consisting biogas plant in Germany

  3. Performance of several  quality measures in the field of biogas educational establishments in Germany

  4. Preliminary planning of a waste biogas plant in Germany

  5. Performance of preliminary planning of a biogas plant capatilizing renewable raw materials in Italy

  6. Complete planning of a waste biogas plant in Italy: design, permission, cost assessment, call for tenders, supervision and start-up

  7. Survey preparation for dry fermentation in Germany

  8. Complete design of a biogas plant using renewable raw materials: conception, permission, cost assessment, call for tenders, supervision according to the order of the general contractor (Germany)

  9. Implementation of preliminary design of a co-fermentation biogas plant in Germany

  10. Performance of a survey about marc fermentation in Germany

  11. Complete design of a big co-fermentation biogas plant: design, permission, cost assessment, call for tender, supervision, start-up in Canada

  12. Elaboration of a safety-related verification and technical estimate of an existing biogas plant in Germany

  13. Study on a combined bioethnol biogas plant in Germany

  14. Complete design of a waste fermentation biogas plant in Spain: conception, permission, cost assessment, call for tender, supervision and start-up

  15. Engineering of a safety-related verification and technical estimate of an existing biogas plant in Germany

  16. Preliminary planning and first layout of a biogas plant in Germany

  17. Performance of preliminary design of a waste fermentation plant in USA

  18. Realization of a preliminary design of a biogas plant using renewable raw materials in Italy

  19. Performance of a safetay-related verification and technical estimate of an existing co-fermentation biogas plant in Germany

  20. Performance of safetay-related verification and technical estimate of an existing a renewable raw input biogas plant in Germany

  21. Performance of a safetay-related verification and technical estimate of an existing co-fermentation biogas plant in Germany

  22. Elaboration of a safety-related verification and technical estimate of an existing biogas plant in Germany using renewable raw materials

  23. Complete engineering of a biogas plant with renewable raw input in Germany: design, permission, cost assessment, call for tender, supervision and start-up

  24. Preliminary planning of extension of an existing plant in Germany

  25. Performance of a safetay-related verification and technical estimate of an existing biogas plant in Germany

  26. Preliminary planning of extension of an existing waste fermentation plant in Germany

  27. Performance of technical assesssment according to a due-diligence examination of an existing biogas plant in Germany

  28. Project engineering of technical assessment of the due-diligence examiniation of an existing plant in Germany

  29. Participation of one network research of the "Fachagentur für nachwachsende Rohstoffe:" Monofermentation von Maissilagen aus Standorten unterschiedlicher Bodenbeschaffenheit " FKZ 22014308"

  30. Design of a combined bio-ethanol plant in Germany

  31. Engineering of a safety-related verification and technical estimate of an existing biogas plant in Canada

  32. Survey of an existing biogas plant in Canada

  33. Referee activities during an international operator training in Canada

  34. Complete design of a waste fermentation biogas plant in Spain: design, permission, cost assessment call for tender, supervision and start-up

  35. Performance of technical assesssment according to a due-diligence examination of an existing biogas plant in Germany

  36. Preparation of a feasilibility study to evaluate the waste fermentation in Germany

  37. Procedure of a preliminary planning and permission of a renewable raw materials biogas plant in Germany

  38. Preparation of an advisory certificate before ending of warranty  period of an excisting biogas plant in Germany

  39. Project engineering of a technical evaluation of a estimate of the due-deligence of an existing biogas plant in Germany, using renewable ressources

  40. Implementation of a preliminary planning and permission design of a biogas plant in Poland

  41. Preparation of a survey relating to the evaluation of solid input technique and the improvement of a biogas in Plant using renewable ressources input (Germany)

  42. Performance of a survey about marc fermentation in Germany

  43. Procedure of the perliminary planning of a reneable raw materials biogas plant in Germany

  44. Engineering of a safety-related verification and technical estimate of an existing biogas plant in Germany

  45. Performance of technical assesssment according to a due-diligence examination of two  existing biogas plants in Germany

  46. Design of a waste fermentation plant in Canada: layout, design, cost assessment, call for tender, supervision and start-up